On this page
  1. Equipment and performance
  2. Home fit and duct evidence
  3. Complete installation scope
  4. Startup, warranties, and economics
  5. Questions and decision notes

Direct answer

Use one copy for each HVAC replacement proposal. Mark every row documented, unclear, excluded, or not applicable; jot the page or section where the answer lives; and ask the bidder to fill in any missing terms in writing. The checklist scores how complete the documentation is, it doesn't rank contractors or judge technical correctness.

Key takeaways

  • Use the same checklist for every bidder.
  • A clear exclusion is honest disclosure, but it can still leave a gap in your project.
  • Don't submit this worksheet, it's built to print and stay with you.

Your next step

Equipment and performance

Write down every model number and the certificate that backs it up, SEER2 is like an MPG rating for cooling.

  • □ Outdoor unit model: ____________________
  • □ Indoor coil or air-handler model: ____________________
  • □ Furnace, thermostat, and accessories: ____________________
  • □ AHRI reference and certified capacity/SEER2/EER2/HSPF2: ____________________
  • □ Refrigerant and capacity-control type: ____________________

Sources: [ahri]

Home fit and duct evidence

Write down the evidence used to size the system and spread that capacity through your home.

  • □ Room-by-room load method and assumptions
  • □ Proposed capacity and selection rationale
  • □ Duct, return, filter, leakage/static-pressure findings
  • □ Comfort, humidity, noise, and room-balance plan
  • □ Required duct changes and post-install verification

Sources: [energy-star-qi]

Complete installation scope

Mark each line included, excluded, an allowance, or not applicable.

  • □ Line set and insulation
  • □ Drains, pan, trap/vent, and overflow protection
  • □ Electrical panel, breaker, conductor, disconnect, whip, and surge protection
  • □ Pad/stand, access, equipment removal, protection, and cleanup
  • □ Permit, inspection, code corrections, and restoration

Sources: [dallas-permits], [fort-worth-permits]

Startup, warranties, and economics

Keep the promised final records together with the contract.

  • □ Commissioning form: airflow/static, charge, temperatures, controls, drains, safeties
  • □ Manufacturer registration and exact certificate
  • □ Labor/workmanship terms and exclusions
  • □ Cash price, deposit, allowances, change-order rules
  • □ Financing: amount, APR, term, fees, payment, total of payments

Sources: [energy-star-qi]

Questions and decision notes

Bidder: ____________________ Date: __________ Follow-up due: __________

  • ________________________________________________________________
  • ________________________________________________________________
  • ________________________________________________________________
  • Decision made only after written revisions: □ Yes □ Not yet

Frequently asked questions

Does the checklist choose the best contractor?

No. It surfaces documentation gaps. Technical quality, the contractor's evidence, price, service, and protections still take your judgment.

Do I need to submit my checklist?

No. It's a private printable, and no contact information is required.

Continue your decision

Sources

  1. AHRI, Directory of Certified Product PerformancePublic lookup for exact certified equipment combinations and ratings.
  2. ENERGY STAR, HVAC Quality InstallationInstallation-quality framework covering sizing, ducts, airflow, and refrigerant charge.
  3. Texas Department of Licensing and Regulation, Air Conditioning and Refrigeration ContractorsOfficial Texas licensing, rules, complaint, and enforcement portal.
  4. City of Dallas, Residential Permitting and InspectionsCurrent Dallas residential permitting starting point.
  5. City of Fort Worth, Residential PermittingCurrent Fort Worth residential permit and inspection starting point.